After inspection passed, the roofing is continuing with the flat roof insulation and hot mop. The stucco work on the parapet is already done so the roof can be sealed against it.
The windows are mostly installed, the plumber, electrician and framer are almost done and the stucco is getting started. The roofer is scheduled for tin cap inspection on Friday and the rough stairs are also installed.