After inspection passed, the roofing is continuing with the flat roof insulation and hot mop. The stucco work on the parapet is already done so the roof can be sealed against it.
The windows are mostly installed, the plumber, electrician and framer are almost done and the stucco is getting started. The roofer is scheduled for tin cap inspection on Friday and the rough stairs are also installed.
The final cap beams and parapets are poured, the trusses in place and the roof plywood is ready for inspection on Monday. The precast window sills are being installed so the window bucks can be started tomorrow
The last blocks for the parapets and party wall are going up now. The next few days will be for preparing the walls for trusses to be flown into place on Friday.